• Home
  • About Us
  • FAQ
  • Contact Us
Classy55
  • Home Design
    • Home Interior
      • Kitchen
      • Bathroom
      • Outdoor
      • Space Saving
  • Classic Brands
  • Work From Home
  • Finds
  • Fashion
  • Trending
  • PMP
Search Here >>
No Result
View All Result
  • Home Design
    • Home Interior
      • Kitchen
      • Bathroom
      • Outdoor
      • Space Saving
  • Classic Brands
  • Work From Home
  • Finds
  • Fashion
  • Trending
  • PMP
Search Here >>
No Result
View All Result
Classy55
No Result
View All Result
Home PMP

PMP-Style Question 14 – project scheduling maturity across phases,

John Adam by John Adam
June 12, 2025
in PMP
0
Share on FacebookShare on Twitter

PMP Referenced Question 14: Forecasting Milestones in Complex Projects

This PMP-style scenario tests the project manager’s understanding of when reliable milestone dates can be provided during a complex project. PMI emphasizes structured planning before committing to timeline forecasts.

📘 Scenario

A project manager has begun a complex oil refinery project. Although the project is in the initiation phase, the sponsor keeps asking for concrete dates for the most important project milestones.

❓ Question

When will the project manager be able to provide the requested information?

  • A. During the planning phase, when processes for scope definition and activity duration and sequencing will be performed
  • B. Close to the end of the project, as the forecasts will be more accurate and most risks will already be mitigated
  • C. In the initiation process, as it happens concurrently with the project contract and project charter creation
  • D. As soon as possible, as project delays can be significantly avoided when a schedule is developed early
⚠️ Disclaimer: This PMP-style question is presented for educational and commentary purposes only. It is not sourced from any official PMI exam and is not intended to violate any copyright. This content reflects interpretations based on the PMI mindset and principles, and is designed to help learners prepare for the PMP exam. If this question resembles real PMP exam content, it is coincidental and used solely under the doctrine of fair use for academic discussion. No claim of affiliation with or endorsement by PMI is made.

✅ Correct Answer: A. During the planning phase, when processes for scope definition and activity duration and sequencing will be performed

  • 📅 PMI requires defining the scope, WBS, activity sequencing, and duration estimation before building a project schedule.
  • 🔍 Milestone dates requested by the sponsor can only be reliable once those planning processes are complete.
  • 🏗 In complex projects (like oil refineries), poor planning leads to costly delays and rework — planning accuracy is critical.

✔ Why Option A is Correct

Planning is where detailed scope, durations, dependencies, and constraints are defined. Only then can the schedule and milestone dates be built. This aligns with PMI’s structured approach to planning before commitment.

✖ Why Other Options Are Incorrect

  • B. Waiting until the end of the project renders the milestone dates useless — forecasts come from planning, not hindsight.
  • C. The initiation phase defines the charter and high-level needs, but not detailed scheduling data.
  • D. While it’s tempting to build a schedule early, PMI warns against premature commitments without proper scoping and sequencing.

📌 Key Takeaway

Reliable milestone forecasts must come from structured planning. PMI expects project managers to develop schedules only after completing scope definition, sequencing, and duration estimates — not during initiation.

PMP candidates must be able to explain why milestone commitments should be grounded in planning. Premature promises can lead to unrealistic expectations and missed targets.

Post Views: 13
John Adam

John Adam

Related Posts

PMP-Style Question 22 – cost estimation inputs, historical data validation

by John Adam
June 12, 2025
0

PMP Referenced Question 22: Validating Budget Inputs for Analogous Estimation This PMP-style scenario focuses on avoiding estimation errors when using historical projects as a baseline. PMI...

PMP-Style Question 21 – understanding of integrated change control

by John Adam
June 12, 2025
0

PMP Referenced Question 21: Rebaselining a Delayed Project Through Change Control This PMP-style scenario focuses on how a project manager should respond when a project is...

PMP-Style Question 20 – Agile change management, backlog ownership

by John Adam
June 12, 2025
0

PMP Referenced Question 20: Resolving Sprint Failures Caused by Scope Volatility This PMP-style scenario focuses on the project manager’s role in facilitating Agile collaboration and backlog...

PMP-Style Question 19 – team support and performance management

by John Adam
June 12, 2025
0

PMP Referenced Question 19: Supporting Team Members Through Knowledge Gaps This PMP-style scenario tests how a project manager should respond to a team member’s performance issue...

PMP-Style Question 18 – Empowering Contractors Under Tight Deadlines

by John Adam
June 12, 2025
0

PMP Referenced Question 18: Empowering Contractors Under Tight Project Deadlines This PMP-style scenario highlights best practices in empowering contracted teams during urgent rollouts. PMI encourages clear...

Next Post

PMP-Style Question 15 – proactive problem-solving

PMP-Style Question 16 – Managing Communication Across Time Zones

PMP-Style Question 17 – document control, versioning

Please login to join discussion

CATEGORIES

  • Bathroom
  • Brands
  • Fashion
  • Home and Work
  • Home Design
  • Home Interior
  • Kitchen
  • Outdoor
  • PMP
  • Secondhand Finds
  • Space Saving
  • Trending

RECOMMENDED

Experience the Marvel : Spectacular Ronaldo Mansion in Saudi Arabia
Trending

Experience the Marvel : Spectacular Ronaldo Mansion in Saudi Arabia

September 20, 2023
PMP

PMP-Style Question 11 – change management, stakeholder engagement

June 12, 2025

TAGS

AdSense approval AdSense tips Architectural marvel best Classic Interior Kitchen Design best classic kitchen design Celebrity homes Classic Interior Kitchen Design classic kitchen Content creation Deep cleaning services Qatar Full time maid services in Qatar Google AdSense 2023 Home automation House maid services Indian maid agency Qatar italian marble dining set italian marble dining table 4 seater italian marble dining table and chairs italian marble dining table designs italian marble dining table price italian marble table top italian marble table top for sale italian travertine marble dining table luxury classic kitchen Luxury real estate Monetization guide Monetize website Nepali house maid available in Qatar Offer maids Qatar Online advertising Online marketing Quality backlinks Real estate investments royal bathroom design royal classic bedroom royal classic console royal classic living room royal classic mirror royal interior design royal interior kitchen design Social media traffic Website approval Website credibility Website monetization Website traffic growth

© 2025 Classy55 All Rights Reserved

  • HOME
  • ABOUT US
  • CONTACT US
  • DISCLAIMER
  • PRIVACY POLICY
  • TERMS AND SERVICES
No Result
View All Result
  • HOME
  • About Us
  • Home Design
  • Home Interior
    • Kitchen
    • Bathroom
  • Outdoor
  • Space Saving
  • Home and Work
  • Finds
  • Fashion
  • PMP
  • Contact Us

© 2025 Classy55 All Rights Reserved